

{"id":5107,"date":"2021-05-14T10:12:11","date_gmt":"2021-05-14T10:12:11","guid":{"rendered":"https:\/\/www.bcenergy.rs\/?p=5107"},"modified":"2021-12-16T13:29:56","modified_gmt":"2021-12-16T13:29:56","slug":"gas-turbine-and-generator-set-ready-for-installation","status":"publish","type":"post","link":"https:\/\/www.bcenergy.rs\/jp\/?p=5107","title":{"rendered":"Steam turbine and generator set ready for installation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\">[vc_row][vc_column][vc_column_text]\n<iframe loading=\"lazy\" src=\"https:\/\/www.youtube.com\/embed\/G-WD2j5kKws\" width=\"100%\" height=\"550\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p>After completion of construction of reinforced concrete structures, key equipment for the Energy-from-Waste plant have started to be delivered and installed, for energy utilization of 340,000 tons\/year of municipal waste. After the commencement of boiler, stack, and flue gas treatment equipment erection a steam turbine and generator set has just been delivered and lifted on its foundations.<\/p>\n<p>30.24 MW of power will be delivered to EPS through 110 kV transmission system to transformation substation \u201cBelgrade 20\u201d and further through the power distribution system to consumers in Belgrade.<\/p>\n<p>56.5 MW of heat will be delivered to Beogradske elektrane through the district heating pipeline which will connect the Energy-from-Waste plant in Vinca with the heating plant \u201cKonjarnik\u201d, from where it will be supplied to consumers in Belgrade.<\/p>\n<p>Instead of fossil fuels, municipal waste, will be used to produce energy, which will largely reduce greenhouse gas emissions and significantly contribute to climate change mitigation.<\/p>\n<p>Integrated waste management will contribute to a faster transformation towards a circular economy and the achievement of sustainable development goals.<\/p>\n<p>The Energy-from-waste plant is scheduled to be commissioned at the end of 2022.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4781\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-06-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-06.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4786\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-07-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-07.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-4788 size-thumbnail\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-08-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-08.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4789\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-11-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-11.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4791\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-13-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-13.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4792\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-15-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-15.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-4793\" src=\"https:\/\/www.bcenergy.rs\/wp-content\/uploads\/2021\/02\/sust-17-150x150.png\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17-150x150.png 150w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17-300x300.png 300w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17-1024x1024.png 1024w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17-768x768.png 768w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17-1536x1536.png 1536w, https:\/\/www.bcenergy.rs\/jp\/wp-content\/uploads\/2021\/02\/sust-17.png 2000w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/p>\n[\/vc_column_text][\/vc_column][\/vc_row]\n<\/div>","protected":false},"excerpt":{"rendered":"<p>After completion of construction of reinforced concrete structures, key equipment for the Energy-from-Waste plant have started to be delivered and installed, for energy utilization of 340,000 tons\/year of municipal waste. After the commencement of boiler, stack, and flue gas treatment equipment erection a gas turbine and generator set has just been delivered and lifted on its foundations.<\/p>\n","protected":false},"author":1,"featured_media":5129,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35,31],"tags":[],"class_list":["post-5107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bce-news","category-news"],"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Beo \u010cista Energija","distributor_original_site_url":"https:\/\/www.bcenergy.rs\/jp","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/posts\/5107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5107"}],"version-history":[{"count":8,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/posts\/5107\/revisions"}],"predecessor-version":[{"id":5152,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/posts\/5107\/revisions\/5152"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=\/wp\/v2\/media\/5129"}],"wp:attachment":[{"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bcenergy.rs\/jp\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}