Electrical Energy Infrastructure

  • 35 kV electro infrastructure comprising of 35 kV/10 kV Transformer Sub-Station, 5 km long 35 kV Overhead Transmission Line and 0,8 km long 35 kV cable connection to redundant electric supply circle, used to supply the electricity the Vinca Integrated Waste Management Centre and to export electricity produced by the Landfill gas facility;
  • 110 kV electro infrastructure comprising of 110 kV switchgear, 5 km long 110 kV overhead transmission line and connection cable and circuit breakers to connect to Belgrade 20 substation, used for the export of the electricity produced by the EfW facility.